UK Onshore
SINGLETON (99.125% interest)
The Singleton field is located in West Sussex, onshore UK. The field was brought on stream in 1989 with peak production of 1,000 BOPD being achieved in 1996 from 4 wells. Current production is approximately 700 BOEPD from 7 wells. The successful drilling of two new production wells in 2005, resulted in an approximate 50% production increase for the field. Estimates of STOIIP at Singleton are c. 107 mmstb of which c. 3.6 MMBO have been produced to date, representing a recovery factor of c. 3.3%. Numerous surface and subsurface studies are ongoing with the objective of raising production from Singleton to 1,000 BOEPD. These activities include but are not limited to, facilities de-bottlenecking, compressed natural gas and the drilling of a new production well on the field in Q1 2009.